logo3_etops.jpg (22654 octets)

EXTENDING ETOPS DIVERSION TIME - TECHNICAL MATTERS

 
im_air_gestion.gif (2583 octets) SAFETY IS SERIOUSLY ENDANGERED

danger.gif (2668 octets)

point_3.gif (88 octets)Safety impact of ALPA/ATA proposal
point_3.gif (88 octets)Non compliance of the safety level with FAR 25.1309

im_air_rensei.gif (2935 octets) AIRWORTHINESS IS PARTICULARLY A PROBLEM

point_3.gif (88 octets)Parameters in the Risk Model
point_3.gif (88 octets)Engine Failure risk
point_3.gif (88 octets)Twin-engines inefficiency  to generate warmth

im_air_comair.gif (2510 octets) THE OPERATIONAL ENVIRONMENT IS A WORRY

point_3.gif (88 octets)Critical diversion airports
point_3.gif (88 octets)Airport capability
point_3.gif (88 octets)Polar winter temperatures
point_3.gif (88 octets)Communications
point_3.gif (88 octets)GLOBALink/HF availability

Home | Background Notes | News &Headlines | Technical matters  |
Discussions | Usefull Links | Accidents statistics